スイス
スイス

myGeobrugg

 - Fierza Hydroelectric Power Station #1 2014

Barrier RXI-100 installed on the slope.

 - Fierza Hydroelectric Power Station #1 2014

Barrier TXI-010 with installed fixed posts (visible lack of space for retaining ropes).

 - Fierza Hydroelectric Power Station #1 2014

Fully installed TXI-010 barrier directly next to the road.

 - Fierza Hydroelectric Power Station #1 2014

Some installation required helicopter usage.

 

システム延長

15 m - 80 m

 

設置年

2014

状況

Rockfalls endangered the roads around Fierza hydroelectric power station.

説明

Rockfall protection with TXI-010 barriers (system with no retaining ropes) and RXI-100 barriers.

As seen in the photos, parts of the project were installed by helicopter, clearly demonstrating how lightweight Geobrugg's systems are.

顧客名

KESH Albania

落札者

Cresta Geo Switzerland

保護対象

道路, 建築

担当者の連絡先

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Country Manager Ost- und Zentralschweiz, Liechtenstein

お問い合わせフォーム

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Industriestrasse 21,5200 Brugg / スイス Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

お問い合わせフォーム

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Project Manager Inspection Services

お問い合わせフォーム

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / スイス Ticino Country Manager

お問い合わせフォーム