スイス
スイス

myGeobrugg

Coquitlam-Bunzten Tunnel Gate Replacement

 - Coquitlam-Bunzten Tunnel Gate Replacement 2021

Protected tunnel portal

 - Coquitlam-Bunzten Tunnel Gate Replacement 2021

The rockfall barrier is unobtrusive, thus not disturbing the beautiful landscape

 - Coquitlam-Bunzten Tunnel Gate Replacement 2021

Above the portal, posts are 7m tall

 - Coquitlam-Bunzten Tunnel Gate Replacement 2021

The protected portal below the barrier

 - Coquitlam-Bunzten Tunnel Gate Replacement 2021

Rapid and successful implementation through teamwork - thanks to all involved!

 

システム延長

42 m

 

設置年

2021

状況

RXE-2000 barrier system needed to be installed to protect a tunnel portal, lay down area,  ventilation, and power sources. Barrier protects equipment as well as infrastructure. 

説明

Geobrugg delivered a 42m long, with 7m tall posts RXE-2000 Barrier at the end of December 2020. Project was completed, with great teamwork, January 2021.

顧客名

保護対象

鉱山/採石場, インフラ, その他

腐食防止

亜鉛めっき, ジェオブルッグ スーパーコーティング

エンジニアリング

Dr. Duncan Wyllie, P.Eng

担当者の連絡先

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Country Manager Ost- und Zentralschweiz, Liechtenstein

お問い合わせフォーム

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Industriestrasse 21,5200 Brugg / スイス Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

お問い合わせフォーム

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Project Manager Inspection Services

お問い合わせフォーム

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / スイス Ticino Country Manager

お問い合わせフォーム