Suisse
Suisse

myGeobrugg

Trek route to Shri Mata Vaishno Devi Shrine (2)

Stabilisation des pentes - Trek route to Shri Mata Vaishno Devi Shrine (2) 2016

TECCO® SYSTEM³ and TECMAT® anti-erosion mat after installation and greening

Stabilisation des pentes - Trek route to Shri Mata Vaishno Devi Shrine (2) 2016

Target of all pilgrims - famous Holy Shrine of Shri Mata Vaishno Devi

Stabilisation des pentes - Trek route to Shri Mata Vaishno Devi Shrine (2) 2016

Scenic route to the Holy Shrine of Shri Mata Vaishno Devi - originally protected with simple canopies

Stabilisation des pentes - Trek route to Shri Mata Vaishno Devi Shrine (2) 2016

Rockfalls were quite eminent and the are for sure required extra safety measures

Stabilisation des pentes - Trek route to Shri Mata Vaishno Devi Shrine (2) 2016

QUAROX® with DELTAX® secondary mesh (also called QUAROX® PLUS) installation in progress

Stabilisation des pentes - Trek route to Shri Mata Vaishno Devi Shrine (2) 2016

Unrolling of QUAROX® high tensile net on the slope

Stabilisation des pentes - Trek route to Shri Mata Vaishno Devi Shrine (2) 2016

Nail drilling works in progress - for extra safety reasons, all the works were implemented through previously unrolled QUAROX® high tensile net

Stabilisation des pentes - Trek route to Shri Mata Vaishno Devi Shrine (2) 2016

Together with active slope stabilization also many rockfall barriers were installed - here visible GBE-3000A type for 3000 kJ

Stabilisation des pentes - Trek route to Shri Mata Vaishno Devi Shrine (2) 2016

TECCO® SYSTEM³ and TECMAT® anti-erosion mat after installation and greening

 

Année d’installation

2016

Situation de départ

There had been several cases of rockfall and landslides in the trek route of the Holy Shrine of Mata Vaishno Devi. Therefore, the Shrine Board decided to actively stabilize the 75º and higher steep slope, up to a maximum height of 70 m in this section. A protective measure had to be selected to stabilize the exposed cutting against superficial instabilities, tilting as well as sliding of individual blocks and rockfalls.

Description

The flexible slope stabilization system consists of TECCO® G65/3 high-tensile steel wire mesh and QUAROX® rolled cable net, system spike plates and soil nails has been selected. Spike plates which match the load capacity of the mesh serve to fix the mesh to soil or rock nails. By tensioning these nails, and recessing the spike plates into the ground, the mesh is adequately tensioned to ensure it follows the surface contours.

Based on the survey results, the authorities also decided to apply a rockfall protection barriers from Geobrugg. With its ring nets made of high-tensile steel wire the barrier design has been tested and approved to absorb impact energies of up to 8000 kJ. A total number of 15 barriers were installed in different locations with energy absorption capacity ranging from 3000 kJ up to 8'000 kJ.

See also our rockfall project Trek route to Shri Mata Vaishno Devi Shrine (1)

Client

Shri Mata Vaishno Devi Shrine Board

Entrepreneur

Pioneer Foundation Engineers Pvt Ltd.

Objet protégé

Route/Rue, Bâtiment, Infrastructure touristique, Infrastructure, Architecture, Autres

Protection anticorrosion

GEOBRUGG SUPERCOATING, GEOBRUGG ULTRACOATING

Ingénierie

Tehri Hydro Development Corporation Ltd.

Autres applications installées

Protection contre les chutes de pierres

Votre contact local

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suisse Country Manager Ost- und Zentralschweiz, Liechtenstein

E-mail

René Müller
   

René Müller

Country Manager Cantons AG BE BL BS FR GE JU NE SO VD VS

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suisse Country Manager Cantons AG BE BL BS FR GE JU NE SO VD VS

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Risques naturels
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suisse Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Suisse Ticino Country Manager

E-mail