语言
中文zh
美国
我的布鲁克

登记处

还没有账户,需要注册吗?

作为注册的myGeobrugg用户,您可以扩展访问下载,我们的尺寸标注工具和我们的活动。

现在注册
布鲁克集团成员
美国
Via Gellia, Derbyshire 2017 - Geobrugg Via Gellia, Derbyshire 2017 - Geobrugg
Via Gellia, Derbyshire 2017 - Geobrugg Via Gellia, Derbyshire 2017 - Geobrugg
Via Gellia, Derbyshire 2017 - Geobrugg Via Gellia, Derbyshire 2017 - Geobrugg
Via Gellia, Derbyshire 2017 - Geobrugg Via Gellia, Derbyshire 2017 - Geobrugg
Via Gellia, Derbyshire 2017 - Geobrugg Via Gellia, Derbyshire 2017 - Geobrugg
Via Gellia, Derbyshire 2017 - Geobrugg Via Gellia, Derbyshire 2017 - Geobrugg

Via Gellia, Derbyshire

   分享
A5102 Via Gellia Road Matlock
邮编
DE4 4HU
地点
Matlock, Derbyshire
国家/地区
英国
安装年份
2017
客户
Derbyshire County Council
工程
AECOM Chesterfield Office
承包商
CAN Geotechnical
防护对象
Road, Quarry / Mine
系统
DELTAX® G80/2, SPIDER® S3-130
腐蚀保护
GEOBRUGG SUPERCOATING®, GEOBRUGG ULTRACOATING®
稳定的地区
946 m²
边坡高度
15 m
边坡坡度从
70 ° - 85 °
博览会
North
情况

During routine maintenance of the rock slope it was noted that a large block was very close to failure. AECOM undertook the geological mapping and survey.

描述

AECOM designed a DELTAX® drape to 90 % of the slope to control the weathering and failure of the rock slope. The large block is a different issue and SPIDER® S3-130 was specified to hold the large block in place. The site was cleared of vegetation, any large trees were treated with eco plugs to kill off the growth of the stump.

Using DTH (down the hole hammer) drilling methods working from top down 3 metres deep GEWI 25 bar was installed. The upper 3 rows of bolts were installed with resin grout, the lower rows were grouted with OPC water mix.

The SPIDER® S3-130 mesh was installed first and secured at all edges with 14 mm wire rope and P33 system spike plates. 

Once all the bolts had been installed the DELTAX® G80/2 mesh was installed from top down over the full site including over the top of the SPIDER® S3-130 mesh. This was profiled in place with P33 system spike plates.

12 mm boundary rope was installed and tensioned to the rockface on all edges. This 12 mm rope was secured to the DELTAX® G80/2 mesh with T2 compression claws.

The road was reopened to public use just 11 days after closure. A total of 946 m² of DELTAX® G80/2 and 235 m² of SPIDER® S3-130 were installed with 44 number 3 meters long GEWI 25 bars.

本地联系方式

Kevin H. Coyle
Kevin H. Coyle
Regional Manager Northeast
自然災害防護
Geobrugg North America, LLC
3 Beaudet Terr
Columbia CT 06237 / 美国
Phone +1 860 377 3230

联系方式

Saleh Feidi
Saleh Feidi
Regional Manager California
自然災害防護
Geobrugg North America, LLC
8921 Emperor Ave.
San Gabriel, California 91775 / 美国
Phone +1 909 706 8964

联系方式

John Kalejta
John Kalejta
Regional Manager Central US
自然災害防護
Geobrugg North America, LLC
3215 67th Avenue Pl
Greeley CO 80634 / 美国
Phone +1 505 220 1404

联系方式

Bob Lyne
Bob Lyne
Regional Manager Southeast
自然災害防護
Geobrugg North America, LLC
8004 Windspray Drive
Summerfield NC 27358 / 美国
Phone +1 336 337 0945

联系方式

Pierce Runnels, Civil Engineer
Pierce Runnels, Civil Engineer
General Manager Geobrugg North America
自然災害防護
Geobrugg North America, LLC
22 Centro Algodones
Phone +1 505 771 4080
手机 +1 505 400 0796

联系方式

Tim Shevlin
Tim Shevlin
Sales Director
自然災害防護
Geobrugg North America, LLC
4676 Commercial St. SE, PMB 174
Salem OR 97302 / 美国
Phone +1 503 423 7258

联系方式