Estabilização de taludes - Via Gellia, Derbyshire 2017

Rope Access vegetation clearence prior to drilling works beginning

Estabilização de taludes - Via Gellia, Derbyshire 2017

Showing the large loose block being stabilised by Spider® S3-130

Estabilização de taludes - Via Gellia, Derbyshire 2017

Looking West at the loose block stabilised by Spider® S3-130

Estabilização de taludes - Via Gellia, Derbyshire 2017

Image showing the DELTAX® G80/2 mesh with underlayed Spider® S3-130 at lower right edge

Estabilização de taludes - Via Gellia, Derbyshire 2017

DELTAX® G80-2 over full height of slope

Estabilização de taludes - Via Gellia, Derbyshire 2017

DELTAX® G80/2 drape

 

Ano de instalação

2017

Situação inicial

During routine maintenance of the rock slope it was noted that a large block was very close to failure. AECOM undertook the geological mapping and survey.

Descrição

AECOM designed a DELTAX® drape to 90 % of the slope to control the weathering and failure of the rock slope. The large block is a different issue and SPIDER® S3-130 was specified to hold the large block in place. The site was cleared of vegetation, any large trees were treated with eco plugs to kill off the growth of the stump.

Using DTH (down the hole hammer) drilling methods working from top down 3 metres deep GEWI 25 bar was installed. The upper 3 rows of bolts were installed with resin grout, the lower rows were grouted with OPC water mix.

The SPIDER® S3-130 mesh was installed first and secured at all edges with 14 mm wire rope and P33 system spike plates. 

Once all the bolts had been installed the DELTAX® G80/2 mesh was installed from top down over the full site including over the top of the SPIDER® S3-130 mesh. This was profiled in place with P33 system spike plates.

12 mm boundary rope was installed and tensioned to the rockface on all edges. This 12 mm rope was secured to the DELTAX® G80/2 mesh with T2 compression claws.

The road was reopened to public use just 11 days after closure. A total of 946 m² of DELTAX® G80/2 and 235 m² of SPIDER® S3-130 were installed with 44 number 3 meters long GEWI 25 bars.

Promotor

Derbyshire County Council

Empreteiro

AECOM Chesterfield Office

Contratante

CAN Geotechnical

Objecto protegido

Estrada, Pedreira/ Minas

Proteção contra a corrosão

GEOBRUGG SUPERCOATING, GEOBRUGG ULTRACOATING

O seu contacto local

Kevin Coyle
 

Kevin Coyle

Regional Manager Northeast

Riscos naturais
Engenharia Hidráulica
Geobrugg North America, LLC,3 Beaudet Terr,CT 06237 Columbia / Estados Unidos Regional Manager Northeast

E-mail

Saleh Feidi
 

Saleh Feidi

Riscos naturais
Engenharia Hidráulica
Geobrugg North America, LLC,8921 Emperor Ave.,91775 San Gabriel, California / Estados Unidos

E-mail

John Kalejta
 

John Kalejta

Riscos naturais
Engenharia Hidráulica
Geobrugg North America, LLC,KS 67226 Wichita / Estados Unidos

E-mail

Bob Lyne
 

Bob Lyne

Riscos naturais
Engenharia Hidráulica
Geobrugg North America, LLC,8004 Windspray Drive,NC 27358 Summerfield / Estados Unidos

E-mail

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

Riscos naturais
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer General Manager Geobrugg North America

E-mail

Tim Shevlin
 

Tim Shevlin

Riscos naturais
Geobrugg North America, LLC,OR 97302 Salem / Estados Unidos

E-mail