瑞士
瑞士

myGeobrugg

Tramway du Mont Blanc - Nid d'Aigle

落石防护 - Tramway du Mont Blanc - Nid d'Aigle 2022

Canopy system protecting the railway

落石防护 - Tramway du Mont Blanc - Nid d'Aigle 2022

Vue latérale de l'ouvrage

 

系统

 

系统长度

70 m

 

安装年份

2022

情况

At the tunnel entrance, just before the Nid d'Aigle arrival station, the Mont Blanc Tramway passes the foot of a cliff subject to rock falls. 

描述

The installation of a CANOPY deflector structure (self-cleaning up to 500 kJ) on a 70 meters long line, in addition to a wire mesh placed on the lower part of the rockface, allowed to secure the site.

承包商

防护对象

Railway

腐蚀保护

GEOBRUGG SUPERCOATING

本地联系方式

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Country Manager Ost- und Zentralschweiz, Liechtenstein

联系地址

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

联系地址

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Project Manager Inspection Services

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 瑞士 Ticino Country Manager

联系地址