瑞士
瑞士

myGeobrugg

落石防护 - Ten West Link 2022

Rockfall barriers protecting the transmission line towers.

落石防护 - Ten West Link 2022

Lateral view of the rockfall barrier

 
 

系统长度

- 230 m

 

安装年份

2022

情况

The Ten West Link project is a new power project from Southern Arizona & California. The project goes across the Eagletail Mountains & Wildreness, where transmission line towers will be built.

描述

Geobrugg was tasked with providing ten GBE-100A-R rockfall barriers to protect ten transmission line towers that will be built. The barriers are three meters high with a total length of 230 meters.

These barriers will protect personnel, roadway and future transmission lines. This particular transmission line will span 125 miles connecting Arizona and California, improving transmission system efficiency and reliability.

Thank you Adams Contracting for the pictures. 

承包商

防护对象

Road, Infrastructure

腐蚀保护

Galvanized

本地联系方式

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Country Manager Ost- und Zentralschweiz, Liechtenstein

联系地址

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

联系地址

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Project Manager Inspection Services

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 瑞士 Ticino Country Manager

联系地址