Shis - Khor Fakkan road

泥石流和滑坡防护 - Shis - Khor Fakkan road 2019

Most demanding system test: A few weeks after installation, a debris flow hit the barrier. A sound design, combined with excellent installation works, stopped the debris and prevented the damage.

泥石流和滑坡防护 - Shis - Khor Fakkan road 2019

Stakeout of the ring net barrier layout: Critical step prior to drilling works to ensure the best performance of the system

泥石流和滑坡防护 - Shis - Khor Fakkan road 2019

Drilling of the lateral spiral wire rope anchors: Different drilling rigs can be used, depending on the prevailing geology, location, and available machines

泥石流和滑坡防护 - Shis - Khor Fakkan road 2019

Depending on the length of the lateral spiral wire rope anchors, different tools are used

泥石流和滑坡防护 - Shis - Khor Fakkan road 2019

As an alternative to stabilizing mesh, a lateral shotcrete layer prevents erosion. The flexible riverbed (V)X barrier was installed within only a couple of days. Great work by Gulf Rock Engineering!

泥石流和滑坡防护 - Shis - Khor Fakkan road 2019

Rockfall barrier GBE-1000A protecting a tunnel portal at Shis - Khor Fakkan road

 
 

系统长度

6 m - 15 m

 

安装年份

2019

情况

The scenic new mountain highway westwards from Khor Fakkan is crossing several Wadis (valleys). Despite the rather arid climate, heavy annual rainfalls are likely to cause debris flows and land- or mudslides along the Wadis.

A solution was necessary to prevent debris flows from blocking the drainage culverts and, even worse, overflow the newly constructed highway.

 

描述

Two 6 meters high VX flexible debris flow barriers

The debris flow barriers were designed using the DEBFLOW online tool in close collaboration with the clients engineering team. The expected impact loads (kN/m²) were calculated based on geology, topography, and other decisive boundary conditions.

In Mai 2019, one of the flexible debris flow barriers underwent the most severe proof: Heavy rainfall triggered several debris flows along the various Wadi's. One of them hit the recently completed barrier which remained undamaged. After an excavator had removed the debris material, the barrier was ready again for the next thunderstorms.

国家/地区

阿拉伯联合酋长国

客户

Gulf Rock Engineering

防护对象

Road

腐蚀保护

GEOBRUGG SUPERCOATING

本地联系方式

Kevin Coyle
 

Kevin Coyle

Regional Manager Northeast

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,3 Beaudet Terr,CT 06237 Columbia / 美国 Regional Manager Northeast

联系地址

Saleh Feidi
 

Saleh Feidi

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,8921 Emperor Ave.,91775 San Gabriel, California / 美国

联系地址

John Kalejta
 

John Kalejta

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,KS 67226 Wichita / 美国

联系地址

Bob Lyne
 

Bob Lyne

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,8004 Windspray Drive,NC 27358 Summerfield / 美国

联系地址

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

自然災害防護
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer General Manager Geobrugg North America

联系地址

Tim Shevlin
 

Tim Shevlin

自然災害防護
Geobrugg North America, LLC,OR 97302 Salem / 美国

联系地址