瑞士
瑞士

myGeobrugg

落石防护 - Seehorn Davos 2022

The Flüela pass road: again protected from rockfall and avalanches

落石防护 - Seehorn Davos 2022

Delivery of the supports and nets by helicopter

落石防护 - Seehorn Davos 2022

The pre-installed ringnet can be drawn like a curtain

落石防护 - Seehorn Davos 2022

Completely installed rockfall and avalanche protection barrier

 

系统

Special Solutions Geobrugg GUARD

 

系统长度

44 m

 

安装年份

2022

情况

A 30-year-old barrier was severely damaged by rockfall. It had to be replaced as quickly as possible to protect the traveled road below from rockfalls and avalanches.

描述

Eberle Landschaftsbau und Geotechnik AG installed the four-meter high and 44-meter long Geobrugg special solution.

2024 the barrer was equipped with GUARD Monitoring devices to detect snow loads and rockfall.

国家/地区

瑞士

防护对象

Road

腐蚀保护

Galvanized

本地联系方式

René Müller
   

René Müller

Country Manager Western Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Monitoring
Geobrugg AG,Trucks via road 14 or 13 only!, Aachstrasse 11,8590 Romanshorn / 瑞士 Country Manager Western Switzerland

联系地址

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Monitoring
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Monitoring
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 瑞士 Country Manager Southern Switzerland

联系地址