美国
美国

myGeobrugg

Scout Road in Mytholmroyd

泥石流和滑坡防护 - Scout Road in Mytholmroyd 2016

Completed section of the SL-150 shallow landslide barrier protecting school access road and houses in Mytholmroyd

泥石流和滑坡防护 - Scout Road in Mytholmroyd 2016

The road closed after the landfill land slip in 2015

泥石流和滑坡防护 - Scout Road in Mytholmroyd 2016

Signs of creeping tension cracks located at the top of the slope

泥石流和滑坡防护 - Scout Road in Mytholmroyd 2016

Another view of the tension cracks

泥石流和滑坡防护 - Scout Road in Mytholmroyd 2016

Geobrugg engineers assisting with the SL-150 shallow landslide barrier line stake-out

泥石流和滑坡防护 - Scout Road in Mytholmroyd 2016

Geobrugg engineers were on site to advise at all key milestones of the project - here to advise on the installation of the posts

泥石流和滑坡防护 - Scout Road in Mytholmroyd 2016

Secondary mesh being attached to the SL-150 shallow landslide barrier

泥石流和滑坡防护 - Scout Road in Mytholmroyd 2016

View of the almost completed SL-150 shallow land slip barrier

 

系统

 

系统长度

232 m - 232 m

 

安装年份

2016

情况

During heavy storms over the Christmas holiday period 2015 a section of slope failed and slid onto Scout Road.  The road is a key access point to a local school which it was important to open as soon as possible.  Geobrugg were called to site to advise on possible solutions to protect the road so the school could be reopened.  After examining the site Geobrugg recommended SL-150 landslide barrier be placed underneath the affected area.

Following further inspection works pre-construction tension cracks were noted at the top of the slope covering approximatly 175 [m] of the slope, the section that failed was only aproximately 40 [in] width.  So it was decided the barrier should cover the entire length to mitigate against further possible landslides.

描述

The client's preferred contractor mobilised to site to start site clearance ahead of installing the barrier during site clearance it was noted that the failed section of slope was an old landfill area containing asbestos and not natural soils. 

With the assistance of Geobrugg engineers the fence line was set out at a length of 232 [m] with a post separation of 6 [m]. To accommodate local topography some post spacings were adjusted and an upslope direction change was marked out. 

Geobrugg engineers were on hand throughout the construction phase to assist with the installation as the contractor had never built a barrier before. The project was completed fall 2016 and the client is happy with the barrier which is the first they have had installed.

国家/地区

英国

客户

Calderdale Council

工程

JBA Consulting Ltd.

承包商

DHRA Geotechnical Ltd.

防护对象

Road

腐蚀保护

Galvanized, GEOBRUGG SUPERCOATING

本地联系方式

Kevin Coyle
 

Kevin Coyle

Regional Manager Northeast

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,3 Beaudet Terr,CT 06237 Columbia / 美国 Regional Manager Northeast

联系地址

Saleh Feidi
 

Saleh Feidi

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,8921 Emperor Ave.,91775 San Gabriel, California / 美国

联系地址

John Kalejta
 

John Kalejta

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,KS 67226 Wichita / 美国

联系地址

Bob Lyne
 

Bob Lyne

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,8004 Windspray Drive,NC 27358 Summerfield / 美国

联系地址

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

自然災害防護
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer General Manager Geobrugg North America

联系地址

Tim Shevlin
 

Tim Shevlin

自然災害防護
Geobrugg North America, LLC,OR 97302 Salem / 美国

联系地址