The area was formed by glaciers. With climate change, the rock underneath, molasse conglomerate rock, has become more unstable. During the past few years sections of rock, some with volumes of around 1 m³, became dangerously loose and were in danger of eminent fall onto the road, the building below and the neighboring pastures.
The Swiss State Agency for Forest and Natural Hazards immediately alerted the regional road inspectorate and political community to the potential risk.
As a short term emergency measure Geobrugg worked with the regional road administration and a local contractor to stabilize the most critical rock sections with SPIDER® S3-130.
As a long-term solution that ensures safe driving conditions for daily commuting, an anchored system was installed. Along the deep chasms all along the molasse bar, three levels of anchors were drilled. The higher and lower levels were drilled to a length of 4 m while the anchors of the middle rows were drilled to a length of 7 m. These anchors were drilled to a grid that measures 2.15 m x 2.15 m.
The whole project from planning to final acceptance took only six weeks.
Phone | 071 466 81 52 |
手机 | 078 783 46 81 |
Phone | +41 71 466 84 57 |
手机 | +41 79 420 84 55 |
Phone | +41 71 466 84 29 |
手机 | +41 78 601 06 14 |
Phone | +41 91 859 36 34 |
手机 | +41 76 508 31 78 |