San Gavino Di Tenda RD62

落石防护 - San Gavino Di Tenda RD62 2022

Overview of structures

落石防护 - San Gavino Di Tenda RD62 2022

Aerial view of the site

落石防护 - San Gavino Di Tenda RD62 2022

Attenuator seen from the top

落石防护 - San Gavino Di Tenda RD62 2022

Left side view of GBE-1000A with rock face connection

 
 

安装年份

2022

情况

Situated below the village of San Gavino Di Tenda, the national road RD62 is dominated by an imposing rock front approximately 70m high and 100m long. In 2021, a major landslide swept away part of the road, closing it for several months. Following this event, a rock risk study commissioned by the Collectivité de Corse revealed the need to carry out safety work.

描述

An initial safety project involved the construction of two lines of high-capacity (5000 kJ) rockfall barriers at the foot and mid-height of the rock front. As for the initially planned lines of barriers, damage seemed likely; the project evolved into constructing an attenuator coupled with three lines of rockfall barriers (GBE-1000A und GBE-2000A). 

Sytem length: ATT-80 : 90 m, GBE-1000A : 48 m + 48 m, GBE-2000A : 30 m

System height: ATT-80 : filet 40 à 50 m, poteaux 5 m, GBE-1000A : 5 m, GBE-2000A : 5 m

国家/地区

法国

客户

Collectivité de Corse

承包商

防护对象

Road

腐蚀保护

GEOBRUGG SUPERCOATING

本地联系方式

René Müller
   

René Müller

Country Manager Western Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Monitoring
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Western Switzerland

联系地址

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Monitoring
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Monitoring
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 瑞士 Country Manager Southern Switzerland

联系地址