Asset Management / Monitoring - Railway Iseo - Edolo 2023

It only takes a few minutes to install the GUARD, immediately ready for use

Asset Management / Monitoring - Railway Iseo - Edolo 2023

The GUARD system must be diversely positioned to collect as many signals as possible. In this case, it was placed on the upslope rope of the five meters high GBE-2000A barrier.

Asset Management / Monitoring - Railway Iseo - Edolo 2023

Also on debris flow barriers, the monitoring system improves safety

Asset Management / Monitoring - Railway Iseo - Edolo 2023

View of Lake Iseo from the five meters high GBE-2000A barrier equipped with GUARD monitoring system

 
 

安装年份

2023

情况

In December 2021, the train on the railway line between Iseo and Edolo derailed due to a rockfall on the tracks.

After this accident, Ferrovie Nord initiated a project that included the installation of both rockfall and debris flow barriers at eight points deemed to be at very high risk. To further enhance safety, 31 GUARD monitoring devices were installed to have real-time information about rockfall events that could co-involve the barriers.

描述

During the execution phase, our technical department collaborated with the Nord_Ing bureau to place the project rockfall barriers directly on site.

In addition to the 31 GUARDs, we also supplied 12,000 m² of TECCO G65/4 and the following barriers:

- 7 GBE-2000A H5 rockfall barriers, totaling 2100 m²

- 1 Debris Flow VX-080 H4

- 1 rockfall barrier GBE-3000A H6

国家/地区

意大利

工程

Nord_ING

承包商

A.C.V. srl

防护对象

Railway

本地联系方式

Jackson Trcka
   

Jackson Trcka

Project Engineer

Monitoring
Geobrugg North America, LLC,22 Centro Algodones,87001 Algodones / 美国 Project Engineer