瑞士
瑞士

myGeobrugg

矿井/隧道 - Quellaveco mine 2023

The mesh can be rolled out, thus allowing quick installation

矿井/隧道 - Quellaveco mine 2023

Several rolls are unrolled at the same time

矿井/隧道 - Quellaveco mine 2023

Workers installing the mesh to protect the overland Girdle-Mine and the Quellaveco Industrial Zone

 
 

安装年份

2023

情况

Quellaveco is an area with high rainfall during the rainy season (from December to March). Detachments of blocks or mass landslides due to weather events occur regularly. Blocks from 1 to 1.5 meters in diameter affected the protection of the Overland Belt and consequently stopped the transport and crushing process.

描述

A drape system with Minax 80/4 mesh was installed in the endangered area.

The solution is based on the data provided by the client about the blocks with high landslide potential in the upper slope zone of the Overland Belt.

System height
First section average of 18 meters
Second section average of 40 meters

System length
First section 60 meters
Second section 120 meters

国家/地区

秘鲁

工程

Anglo American Quellaveco – Technical Services Area / geotechnics

承包商

Desnivel Peru S.A.C.

防护对象

Mine / Quarry

本地联系方式

René Müller
   

René Müller

Country Manager Western Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Monitoring
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Western Switzerland

联系地址

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Monitoring
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Monitoring
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / 瑞士 Country Manager Southern Switzerland

联系地址