瑞士
瑞士

myGeobrugg

边坡稳定 - Purple Rock East 2015

View of stabilized slope from the top

边坡稳定 - Purple Rock East 2015

.

边坡稳定 - Purple Rock East 2015

Drilling works on the top slope

边坡稳定 - Purple Rock East 2015

Installation of TECCO SYSTEM with telescopic crane

 
 

安装年份

2015

情况

Rock slope with risk of rockfall due to fractured and weathered rock mass.

描述

Slope stabilization with TECCO System (G65-3)and anchors of D32 mm every 2 meters.

客户

Autoridad del Canal de Panamá - ACP

承包商

Alvarado & Düring International

腐蚀保护

GEOBRUGG SUPERCOATING

工程

Autoridad del Canal de Panamá - ACP

本地联系方式

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Country Manager Ost- und Zentralschweiz, Liechtenstein

联系地址

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

联系地址

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Project Manager Inspection Services

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 瑞士 Ticino Country Manager

联系地址