美国
美国

myGeobrugg

边坡稳定 - Paseo San Nicolás 2018

The slope with TECCO® G65/3

边坡稳定 - Paseo San Nicolás 2018

Staking out the drilling points

 
 

安装年份

2018

情况

In the residential area of San Nicolas, superficial problems of instability occurred in 2017. The real estate developer of the project asked for a solution to protect the back yards of some houses, which were already inhabited.

地質學

Lime soil layer.

描述

A superficial stabilization with TECCO® G65/3, erosion control mat and nails between 3 to 6 meters was installed.

客户

Portales de Nuevo Emperador S.A.

承包商

NDC

防护对象

Residential area

腐蚀保护

GEOBRUGG SUPERCOATING

工程

Eng. José Harris

本地联系方式

Kevin H. Coyle
 

Kevin H. Coyle

Regional Manager Northeast

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,3 Beaudet Terr,Columbia CT 06237 / 美国 Regional Manager Northeast

联系地址

Saleh Feidi
 

Saleh Feidi

Regional Manager California

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,8921 Emperor Ave.,San Gabriel, California 91775 / 美国 Regional Manager California

联系地址

John Kalejta
 

John Kalejta

Regional Manager Central US

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,3215 67th Avenue Pl,Greeley CO 80634 / 美国 Regional Manager Central US

联系地址

Bob Lyne
 

Bob Lyne

Regional Manager Southeast

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,8004 Windspray Drive,Summerfield NC 27358 / 美国 Regional Manager Southeast

联系地址

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

自然災害防護
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer General Manager Geobrugg North America

联系地址

Tim Shevlin
 

Tim Shevlin

Sales Director

自然災害防護
Geobrugg North America, LLC,Salem OR 97302 / 美国 Sales Director

联系地址