瑞士
瑞士

myGeobrugg

Monitoring - Mellitz 2021

Installation of Geobrugg GUARD on the top support rope with a torque wrench

Monitoring - Mellitz 2021

Rockfall barrier, view from behind

Monitoring - Mellitz 2021

Snowloads measured during winter 2020/2021

 

安装年份

2021

情况

The road has been protected for years by rockfall barriers RXI-200. Due to the high snowfall in this region, the Geobrugg GUARDs were installed for test purposes. The aim was to confirm that the Geobrugg GUARD also measures the slowly increasing snow load.

描述

To guarantee constant monitoring, three Geobrugg GUARD devices were installed:

  • With an acceleration sensor, larger rock impacts can be detected.
  • The force measurement measures the slow filling of the fence. This enables measuring the snow load in the winter months.
  • Furthermore, a corrosion sensor records the corrosion at this specific location, classifies it, and calculates the material service life.

客户

BBA Lienz

承包商

Felbermayr

防护对象

Road

其他安装的应用程序

落石防护

本地联系方式

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Country Manager Ost- und Zentralschweiz, Liechtenstein

联系地址

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

联系地址

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Project Manager Inspection Services

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 瑞士 Ticino Country Manager

联系地址