瑞士
瑞士

myGeobrugg

边坡稳定 - Maconde Cliff 2023

Installation of the drape system.

边坡稳定 - Maconde Cliff 2023

Installation of the mesh with the help of a rope access worker.

边坡稳定 - Maconde Cliff 2023

Lateral view of the TECCO mesh.

边坡稳定 - Maconde Cliff 2023

Transport of the mesh roll with the crane.

边坡稳定 - Maconde Cliff 2023

Rolling down the TECCO mesh.

边坡稳定 - Maconde Cliff 2023

The TECCO mesh blends in well with the surrounding.

 
 

安装年份

2023

情况

On the South coast of Mauritius, at Maconde Cliff, a famous tourist attraction, many unstable rocks needed to be secured. The biggest problems were some major horizontal joints, weathered rocks and the presence of discontinuities along large rocks. The cliff is 30 metres high and 175 metres long with an inclination of 85 degrees.

描述

After a site visit, we prepared a preliminary design proposal with the use of the RUVOLUM Tool. 

To prevent slope failures and falling rocks several sections required an active and passive slope stabilization system. The active being the TECCO System and the passive one being the drape system.

Both systems used to stabilize the cliff were made from TECCO G65/3 stainless steel mesh.

 

A big thank you to Yannick Labonne from Acrocha CO LTD for the stunning pictures. 

承包商

防护对象

Road, Touristic infrastructure

腐蚀保护

INOX / STAINLESS

工程

分包商

本地联系方式

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Country Manager Ost- und Zentralschweiz, Liechtenstein

联系地址

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

联系地址

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Project Manager Inspection Services

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 瑞士 Ticino Country Manager

联系地址