瑞士
瑞士

myGeobrugg

Les Gorges du Chauderon

落石防护 - Les Gorges du Chauderon 2023

View of the CANOPY SCC-500 protecting the walking path.

落石防护 - Les Gorges du Chauderon 2023

People walking through the new protected path.

落石防护 - Les Gorges du Chauderon 2023

Installation of the Canopy system.

 

系统长度

39 m - 45 m

 

安装年份

2023

情况

In May 2021, a tragic accident occurred in the lower part of the Gorges du Chauderon hiking trail, which connects the old town of Montreux with Les Avants. As a result, the trail was closed in order to take safety measures.

描述

After the road closure, extensive forestry and rock clearance work took place.

Due to the terrain conditions and the continuing risk of falling rocks, it was decided to secure two sections with one Canopy SCC-500 system each.

The two systems protect hikers from falling rocks and redirect them further into the gorge (self-cleaning systems).

The type of net used for these barriers was the ROCCO 7/3/300 with a secondary mesh TECCO G45/2.

 

Thank you for the pictures La Torpille

国家/地区

瑞士

防护对象

Touristic infrastructure

腐蚀保护

GEOBRUGG SUPERCOATING

本地联系方式

René Müller
   

René Müller

Country Manager Western Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Western Switzerland

联系地址

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG Project Manager Sales Eastern Switzerland

联系地址

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Trucks via road 14 or 13 only!, Aachstrasse 11,8590 Romanshorn / 瑞士 Project Manager Inspection Services

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / 瑞士 Country Manager Southern Switzerland

联系地址