美国
美国

myGeobrugg

Monitoring - Leirvik E10 2020

The barrier seen from below

Monitoring - Leirvik E10 2020

Barriers and tunnels protect the traffic on the Norvegian E10

Monitoring - Leirvik E10 2020

GEOBRUGG SUPERCOATING - protection against corrosion

Monitoring - Leirvik E10 2020

Close-up: rockfall barrier with GUARD monitoring device on the restraining rope (left)

 

安装年份

2020

情况

The area has a high risk of rockfall. Tunnels protect the traffic over long distances. New rockfall protection became necessary after a rockfall destroyed a barrier.

描述

In 2020 an RXE-8000 rockfall protection with a total length of 105 meters and a height of seven meters was installed. Additionally, four Geobrugg GUARDs monitor the corrosion (data are available via a dashboard).

承包商

防护对象

Road

本地联系方式

Kevin Coyle
 

Kevin Coyle

Regional Manager Northeast

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,3 Beaudet Terr,CT 06237 Columbia / 美国 Regional Manager Northeast

联系地址

Saleh Feidi
 

Saleh Feidi

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,8921 Emperor Ave.,91775 San Gabriel, California / 美国

联系地址

John Kalejta
 

John Kalejta

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,KS 67226 Wichita / 美国

联系地址

Bob Lyne
 

Bob Lyne

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,8004 Windspray Drive,NC 27358 Summerfield / 美国

联系地址

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

自然災害防護
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer General Manager Geobrugg North America

联系地址

Tim Shevlin
 

Tim Shevlin

自然災害防護
Geobrugg North America, LLC,OR 97302 Salem / 美国

联系地址