瑞士
瑞士

myGeobrugg

边坡稳定 - Lago Emperador 2018

View of wall with steel support structure

边坡稳定 - Lago Emperador 2018

Wall with supportive mesh structure

边坡稳定 - Lago Emperador 2018

Outside view of the protected wall

 
 

安装年份

2018

情况

The wall above the concrete mixer showed signs of deterioration.

描述

After a structural analysis: Steel cables and DELTAX® 80/2 mesh support the wall and transfer the forces to the ground through spiral rope anchors placed on the slopes lateral to the wall.

国家/地区

巴拿马

客户

Concretos Emperador S.A.

工程

IDM Ingeniería y Construcción S.A.

承包商

IDM Ingeniería y Construcción S.A.

分包商

NDC

防护对象

Building, Infrastructure, Other

腐蚀保护

GEOBRUGG SUPERCOATING, INOX / STAINLESS

本地联系方式

René Müller
   

René Müller

Country Manager Western Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Monitoring
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Western Switzerland

联系地址

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Monitoring
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

联系地址

Matthias Denk, Msc. Env. Eng.
 

Matthias Denk

自然災害防護
Hydraulic Engineering
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 , Msc. Env. Eng.

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Monitoring
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / 瑞士 Country Manager Southern Switzerland

联系地址