The wall above the concrete mixer showed signs of deterioration.
After a structural analysis: Steel cables and DELTAX® 80/2 mesh support the wall and transfer the forces to the ground through spiral rope anchors placed on the slopes lateral to the wall.
Phone | +1 860 377 3230 |
Phone | +1 909 706 8964 |
Phone | +1 505 220 1404 |
Phone | +1 336 337 0945 |
Phone | +1 505 771 4080 |
手机 | +1 505 400 0796 |
Phone | +1 503 423 7258 |