美国
美国

myGeobrugg

矿井/隧道 - Hellas Gold 2019

Debris flow barrier after installation, complete with abrasion protection and winglets

矿井/隧道 - Hellas Gold 2019

Before placing the anchors in concrete

矿井/隧道 - Hellas Gold 2019

Setting up the posts and fastening the pre-assembled ring net

矿井/隧道 - Hellas Gold 2019

Nearly finished - winglets and abrasion protection are next to come

 

系统

 

安装年份

2019

情况

At the Hellas Gold mine, protection from debris flow had become necessary in phase 1 (2019 - 2027) area.

描述

Installation of a 4 meters high, u-shaped ring net debris flow barrier

国家/地区

希腊

客户

Hellas Gold

防护对象

Mine / Quarry, Other

腐蚀保护

GEOBRUGG SUPERCOATING

本地联系方式

Kevin Coyle
 

Kevin Coyle

Regional Manager Northeast

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,3 Beaudet Terr,CT 06237 Columbia / 美国 Regional Manager Northeast

联系地址

Saleh Feidi
 

Saleh Feidi

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,8921 Emperor Ave.,91775 San Gabriel, California / 美国

联系地址

John Kalejta
 

John Kalejta

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,KS 67226 Wichita / 美国

联系地址

Bob Lyne
 

Bob Lyne

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,8004 Windspray Drive,NC 27358 Summerfield / 美国

联系地址

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

自然災害防護
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer General Manager Geobrugg North America

联系地址

Tim Shevlin
 

Tim Shevlin

自然災害防護
Geobrugg North America, LLC,OR 97302 Salem / 美国

联系地址