瑞士
瑞士

myGeobrugg

Exit portal Railway Tunel Biobío

边坡稳定 - Exit portal Railway Tunel Biobío 2022

Front view of the Exit Portal

边坡稳定 - Exit portal Railway Tunel Biobío 2022

Setting out anchors

边坡稳定 - Exit portal Railway Tunel Biobío 2022

Drilling process

边坡稳定 - Exit portal Railway Tunel Biobío 2022

Top view of the portal

边坡稳定 - Exit portal Railway Tunel Biobío 2022

View of the portal and the railway bridge under construction

 

安装年份

2022

情况

The new Biobío railway bridge project in the city of Concepción included a new railway line with a tunnel through Chepe Hill. The portals of this tunnel had to be reinforced. The system designed for this reinforcement was shotcrete and 9 meters long anchor bolts.

地質學

Weathered granitic rocks of the coastal batholith (maicillo)

描述

Geobrugg was approached for a solution that reduces the intervention's visual impact and the reinforcement's carbon footprint. With these requirements in mind, Geobrugg proposed replacing the shotcrete with TECCO GREEN mesh, which has a lower carbon footprint and allows the portals to be revegetated.

客户

承包商

防护对象

Railway

腐蚀保护

GEOBRUGG SUPERCOATING

本地联系方式

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Country Manager Ost- und Zentralschweiz, Liechtenstein

联系地址

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

联系地址

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Project Manager Inspection Services

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 瑞士 Ticino Country Manager

联系地址