瑞士
瑞士

myGeobrugg

Exit portal Railway Tunel Biobío

边坡稳定 - Exit portal Railway Tunel Biobío 2022

Front view of the Exit Portal

边坡稳定 - Exit portal Railway Tunel Biobío 2022

Setting out anchors

边坡稳定 - Exit portal Railway Tunel Biobío 2022

Drilling process

边坡稳定 - Exit portal Railway Tunel Biobío 2022

Top view of the portal

边坡稳定 - Exit portal Railway Tunel Biobío 2022

View of the portal and the railway bridge under construction

 

安装年份

2022

情况

The new Biobío railway bridge project in the city of Concepción included a new railway line with a tunnel through Chepe Hill. The portals of this tunnel had to be reinforced. The system designed for this reinforcement was shotcrete and 9 meters long anchor bolts.

地質學

Weathered granitic rocks of the coastal batholith (maicillo)

描述

Geobrugg was approached for a solution that reduces the intervention's visual impact and the reinforcement's carbon footprint. With these requirements in mind, Geobrugg proposed replacing the shotcrete with TECCO GREEN mesh, which has a lower carbon footprint and allows the portals to be revegetated.

国家/地区

智利

客户

承包商

防护对象

Railway

腐蚀保护

GEOBRUGG SUPERCOATING

本地联系方式

René Müller
   

René Müller

Country Manager Western Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Western Switzerland

联系地址

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG Project Manager Sales Eastern Switzerland

联系地址

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Trucks via road 14 or 13 only!, Aachstrasse 11,8590 Romanshorn / 瑞士 Project Manager Inspection Services

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / 瑞士 Country Manager Southern Switzerland

联系地址