瑞士
瑞士

myGeobrugg

El Florido - Los Ranchos

泥石流和滑坡防护 - El Florido - Los Ranchos 2019

Drone view of the SL-150 shallow landslide barrier

泥石流和滑坡防护 - El Florido - Los Ranchos 2019

View of the SL-150 barrier from the road

泥石流和滑坡防护 - El Florido - Los Ranchos 2019

The barrier from upslope

泥石流和滑坡防护 - El Florido - Los Ranchos 2019

The SL-150 from down slope

泥石流和滑坡防护 - El Florido - Los Ranchos 2019

After the first raining day of Hurricane Eta in November 2020

泥石流和滑坡防护 - El Florido - Los Ranchos 2019

On November 5th, 2020, the barrier is almost filled

泥石流和滑坡防护 - El Florido - Los Ranchos 2019

The road was clear and without traffic interruptions during and after the hurricane

 

系统

 

系统长度

64 m

 

安装年份

2019

情况

Shallow landslide events are a risk at km 36+350 Sector 3, Los Ranchos - El Florido. A gabion wall was not enough to protect the road.

描述

The first dynamic barrier in Honduras was installed on this road: an SL-150 barrier.

国家/地区

洪都拉斯

客户

BCIE

工程

ACI

承包商

Queiroz Galvao

分包商

ICA Inversiones

防护对象

Road

腐蚀保护

GEOBRUGG SUPERCOATING

本地联系方式

René Müller
   

René Müller

Country Manager Western Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Monitoring
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Western Switzerland

联系地址

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Monitoring
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

联系地址

Matthias Denk, Msc. Env. Eng.
 

Matthias Denk

自然災害防護
Hydraulic Engineering
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 , Msc. Env. Eng.

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Monitoring
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / 瑞士 Country Manager Southern Switzerland

联系地址