In March 2021, a rockfall of around 15,000 tons occurred near Kestert. The track and the road underneath had to be closed.

描述

After scaling and clearing works, the protective netting was installed. The nailings are between six and twelve meters long. Other at-risk sections were secured with SPIDER S3-130 and SPIDER S4-130.

国家/地区

德国

客户

承包商

Feldhaus Bergbau GmbH & Co. KG, Karl-Heinz Schneider Baugeschäft GmbH, Schönberger Bau GmbH & Co. KG

防护对象

Road, Railway

腐蚀保护

GEOBRUGG SUPERCOATING

本地联系方式

Kevin Coyle
 

Kevin Coyle

Regional Manager Northeast

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,3 Beaudet Terr,CT 06237 Columbia / 美国 Regional Manager Northeast

联系地址

Saleh Feidi
 

Saleh Feidi

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,8921 Emperor Ave.,91775 San Gabriel, California / 美国

联系地址

John Kalejta
 

John Kalejta

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,KS 67226 Wichita / 美国

联系地址

Bob Lyne
 

Bob Lyne

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,8004 Windspray Drive,NC 27358 Summerfield / 美国

联系地址

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

自然災害防護
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer General Manager Geobrugg North America

联系地址

Tim Shevlin
 

Tim Shevlin

自然災害防護
Geobrugg North America, LLC,OR 97302 Salem / 美国

联系地址