瑞士
瑞士

myGeobrugg

边坡稳定 - Cucuta Pamplona Hill 2015

Combination with active anchors

边坡稳定 - Cucuta Pamplona Hill 2015

Lateral view of the solution

边坡稳定 - Cucuta Pamplona Hill 2015

Combination with active anchors

边坡稳定 - Cucuta Pamplona Hill 2015

Front view of the slope

边坡稳定 - Cucuta Pamplona Hill 2015

Greening process

 

安装年份

2015

情况

The three critical slopes in the area of Cúcuta - Pamplona measure over 120 meters in height.


描述

The San Simón concession (the companies Fondo de Adaptacion and Latinoamericana de Construcciones), decided to implement 2'5000 m² of DELTAX and 4'725 m² of TECCO G65/3.

The mesh system was accompanied by an erosion control mantle covering in some cases active anchors that are installed to guarantee the global stability of the critical site.

客户

Fondo de Adaptacion

承包商

Concesion San Simon

防护对象

Road

分包商

Latinoamericana de construcciones

本地联系方式

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Country Manager Ost- und Zentralschweiz, Liechtenstein

联系地址

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

联系地址

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Project Manager Inspection Services

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 瑞士 Ticino Country Manager

联系地址