瑞士
瑞士

myGeobrugg

边坡稳定 - Cucunuba walking path 2017

The steep walking path lies underneath the stabilized slope

边坡稳定 - Cucunuba walking path 2017

TECCO® GREEN after installation

边坡稳定 - Cucunuba walking path 2017

The mesh with the erosion control mat perfectly adapts to the uneven ground

边坡稳定 - Cucunuba walking path 2017

Looking down the stabilized slope

 

安装年份

2017

情况

The client had identified several points of instability located along the path to the Chapel of Our Lady of Lourdes in the Cucunuba municipality. The risk was due to material falling on a path that is regularly used by visitors to the town

地質學

Residual soil and some levels of weathered rock that appear on the surface.

描述

To enable a fast re-vegetation, TECCO® GREEN was installed. This system integrates a high resistance mesh and an erosion control mat. It significantly reduces installation time and enables a rapid greening process throughout the slope.

客户

Corporacion Autonoma Regional

防护对象

Road, Touristic infrastructure

本地联系方式

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Country Manager Ost- und Zentralschweiz, Liechtenstein

联系地址

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

联系地址

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Project Manager Inspection Services

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 瑞士 Ticino Country Manager

联系地址