瑞士
瑞士

myGeobrugg

泥石流和滑坡防护 - Casa Teja Barriers 2011

Completly installed barrier with abrasion protection

泥石流和滑坡防护 - Casa Teja Barriers 2011

Installation of the debris flow barrier

泥石流和滑坡防护 - Casa Teja Barriers 2011

View from the upper barrier on the lower barrier

泥石流和滑坡防护 - Casa Teja Barriers 2011

Large blocks are held back by the barrier

泥石流和滑坡防护 - Casa Teja Barriers 2011

Protected bridge and barrier

泥石流和滑坡防护 - Casa Teja Barriers 2011

During installation, without abrasion protection

泥石流和滑坡防护 - Casa Teja Barriers 2011

Both barriers on a birds view

 

系统长度

12 m - 14 m

 

安装年份

2011

情况

The culvert under this bridge at the Quebrada Casa Teja was constantly at the risk of being clogged by debris flow.
In addition, one of the bridge piers could be hit and damaged by blocks of rock.

描述

Two Geobrugg debris flow barriers were implemented. They have the capacity to hold between 500 and 1'000 .

客户

Concesión Bogotá - Villavicencio / COVIANDES

承包商

Sáenz González Constructores S.A

防护对象

Road, Infrastructure

腐蚀保护

GEOBRUGG SUPERCOATING

工程

Hidroconsulta S.A.S

本地联系方式

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Country Manager Ost- und Zentralschweiz, Liechtenstein

联系地址

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

联系地址

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Project Manager Inspection Services

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 瑞士 Ticino Country Manager

联系地址