瑞士
瑞士

myGeobrugg

边坡稳定 - Bridger Coal Mine 2004

Protective mesh installed on the rockface slope

边坡稳定 - Bridger Coal Mine 2004

Installation of TECCO® G65/3

边坡稳定 - Bridger Coal Mine 2004

Installed TECCO®

边坡稳定 - Bridger Coal Mine 2004

Mesh covering the rock

 
 

安装年份

2004

情况

At this open pit mine, tunnel portals were put to go underground to follow coal seams. These tunnel portals are located at the bottom of a high wall.

描述

The high wall was draped with TECCO® System mesh to protect personnel and equipment during construction and operation of the portals.

客户

Private

承包商

Yenter Companies

防护对象

Mine / Quarry

腐蚀保护

GEOBRUGG SUPERCOATING

工程

Seegmiller International

其他安装的应用程序

矿井/隧道

本地联系方式

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Country Manager Ost- und Zentralschweiz, Liechtenstein

联系地址

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

联系地址

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Project Manager Inspection Services

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 瑞士 Ticino Country Manager

联系地址