美国
美国

Baselstrasse, Lucerne

Baselstrasse / Kreuzstutz, 6003, Luzern, 瑞士
2014
客户
City of Lucerne
工程
IUB Lucerne
防护对象
Building
系统的高度
3.5 m
系统长度
- 364 m
系统道数
10
张力
- m³
其他安装的应用程序
泥石流和滑坡防护
情况

Behind Baselstrasse in the city of Lucerne, at the Gütsch, there is a steep slope (45° +/-15°) in the immediate vicinity of apartment buildings. Records of past events show a clear and obvious risk potential for impact from falling rock, toppled trees and shallow landslides.

描述

To minimize disruption of the unstable soil, the barriers were installed on specially design drainage groundworks. The posts were placed no more than 8 m apart to further stabilize the drainage foundation.

More about Debris Flow & Shallow Landslide Protection

本地联系方式

Kevin H. Coyle
Kevin H. Coyle
Regional Manager Northeast
自然災害防護, Coastal Erosion Protection
Geobrugg North America, LLC
3 Beaudet Terr
Columbia CT 06237 / 美国
Saleh Feidi
Saleh Feidi
Regional Manager California
自然災害防護, Coastal Erosion Protection
Geobrugg North America, LLC
8921 Emperor Ave.
San Gabriel, California 91775 / 美国
John Kalejta
John Kalejta
Regional Manager Central US
自然災害防護, Coastal Erosion Protection
Geobrugg North America, LLC
3215 67th Avenue Pl
Greeley CO 80634 / 美国
Bob Lyne
Bob Lyne
Regional Manager Southeast
自然災害防護, Coastal Erosion Protection
Geobrugg North America, LLC
8004 Windspray Drive
Summerfield NC 27358 / 美国
Pierce Runnels, Civil Engineer
Pierce Runnels, Civil Engineer
General Manager Geobrugg North America
自然災害防護
Geobrugg North America, LLC
22 Centro Algodones
Tim Shevlin
Tim Shevlin
Sales Director
自然災害防護
Geobrugg North America, LLC
Salem OR 97302 / 美国