瑞士
瑞士

myGeobrugg

Tahual, Cuenca - Gualaceo

落石防护 - Tahual, Cuenca - Gualaceo 2017

Small rocks stopped by the barrier on their path to the road

落石防护 - Tahual, Cuenca - Gualaceo 2017

View down on the RXE-5000 barrier

落石防护 - Tahual, Cuenca - Gualaceo 2017

View from the road to the RXE-5000 barrier

落石防护 - Tahual, Cuenca - Gualaceo 2017

Final control of the installed barrier

 

系统

 

系统长度

50 m - 50 m

 

安装年份

2017

情况

Continuous rockfall with blocks of up to 8 m³ presented a high risk for drivers on the road from Cuenca to the touristic city of Gualaceo. Frequently, the road had to be closed on the stretch El descanso - El Paute, when rock blocks had come down on the Tahual slope.

描述

Today an RXE-5000 rockfall barrier controls the rockfall events.

客户

MTOP

承包商

PIVALTEC S.A.

防护对象

Road

腐蚀保护

GEOBRUGG SUPERCOATING

分包商

Geo Construcciones

其他安装的应用程序

边坡稳定

本地联系方式

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Country Manager Ost- und Zentralschweiz, Liechtenstein

联系地址

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

联系地址

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Project Manager Inspection Services

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 瑞士 Ticino Country Manager

联系地址