瑞士
瑞士

myGeobrugg

落石防护 - Røldal 2017

RXE-5000 rockfall protection system completely installed and «waiting» for rocks.

落石防护 - Røldal 2017

Support ropes and transmission ropes installed with ROCCO® ring net ready for installation at the posts.

落石防护 - Røldal 2017

Installation of 8 meter high posts

落石防护 - Røldal 2017

Support ropes and transmission ropes installed; ROCCO® ring net ready for installation at the posts.

 

系统

 

系统长度

50 m - 50 m

 

安装年份

2017

情况

A transformator station (Transformatorstasjon) had to be protected from rockfall.

描述

A 8 meters high RXE-5000 barrier was installed.

客户

Norsk Bergsikring AS

承包商

Norsk Bergsikring AS

防护对象

Road, Building, Infrastructure

腐蚀保护

Galvanized, GEOBRUGG SUPERCOATING

本地联系方式

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Country Manager Ost- und Zentralschweiz, Liechtenstein

联系地址

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

联系地址

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Project Manager Inspection Services

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 瑞士 Ticino Country Manager

联系地址