瑞士
瑞士

myGeobrugg

City of Atlanta Water Supply

边坡稳定 - City of Atlanta Water Supply 2016

Northerly view of quarry slope to be protected - visible preparations for TBM deployment. Photo thanks to courtesy of Scarptec Inc.

边坡稳定 - City of Atlanta Water Supply 2016

Installation of high tensile steel TECCO® G65/3 drape. Photo thanks to courtesy of Scarptec Inc.

边坡稳定 - City of Atlanta Water Supply 2016

Another perspective of drape system being installed. Note painted drilling point for rock bolts used to secure larger boulder. Photo thanks to courtesy of Scarptec Inc.

边坡稳定 - City of Atlanta Water Supply 2016

View of GBE-1000A rockfall barrier line serving as rockfall canopy directly above TBM entry portal. TECCO® drape secured locally to capture rocks. Photo thanks to courtesy of Scarptec Inc.

边坡稳定 - City of Atlanta Water Supply 2016

View from below of the GBE-1000A rockfall barrier with hinged posts allowing easy slope morphology adjustments. Photo thanks to courtesy of Scarptec Inc.

 

安装年份

2016

情况

Bellwood Quarry outside of Atlanta (GA) will now be used for City of Atlanta water supply. In preparation to house the water supply and construct the distribution tunnel system a temporary and permanent system needed to be designed to protect workers, equipment and infrastructure from rocks falling off the 315 ft high and 365 ft long north facing slope. An additional temporary solution also needed to be implemented to protect workers and equipment at the tunnel portal.

地質學

Granite

描述

The solution was a 114 000 ft² TECCO® G65/3 drape system and two GBE-1000A rockfall barriers forming canopies. The challenge was to provide a feasible and cost effective solution that could be strong enough to contain rocks 2.5 ft in diameter falling from 285 ft. The system had to be strong yet light weight enough for effective installation. The GBE-1000A systems were bolted to the rockface with the TECCO® G65/3 drape tied locally to ensure capture of the rock. Larger boulders were secured with rock bolts to reduce system requirements. The drape will be left after the site is filled to contain underwater rockfall. The canopies will be removed. 

Learn more about the project: 
City of Atlanta Department of Watershed management (YouTube)

客户

City of Atlanta

承包商

Guy F. Atkinson Construction LLC

防护对象

Mine / Quarry, Infrastructure

腐蚀保护

Galvanized, GEOBRUGG SUPERCOATING

工程

Scarptec Inc.

分包商

Apex Rockfall, LLC

其他安装的应用程序

落石防护, 矿井/隧道

本地联系方式

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Country Manager Ost- und Zentralschweiz, Liechtenstein

联系地址

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

联系地址

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Project Manager Inspection Services

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 瑞士 Ticino Country Manager

联系地址