Stabilizacja skarp - Baia Mare - Sighetul Marmaţiei 2019

Panoramic view onto the stabilized area

Stabilizacja skarp - Baia Mare - Sighetul Marmaţiei 2019

Area to be protected by our slope stabilisation

Stabilizacja skarp - Baia Mare - Sighetul Marmaţiei 2019

GBE-500A protects the road from upcoming rockfalls

Stabilizacja skarp - Baia Mare - Sighetul Marmaţiei 2019

TECCO system adapts perfectly to the soil

 

Rok Instalacji / Montazu

2019

Sytuacja początkowa

Between Baia Mare and Sighetul Marmației, the highway DN18 crosses a hilly area, rich in vegetation, with significant differences in level. In spring and seasons with heavy rainfall there is an increased risk of landslides. Therefore, it was decided to intervene in six areas within the project, with protective measures against rock falls or landslide prevention.

Geologia

Versanți alcătuiți preponderent din roci vulcanice, cu grad de alterare mediu spre mare.

Opis zastosowanego rozwiazania

It was decided to install a high-performance protection and stabilization system in five areas.

As there were no indications of global stability problems, this was considered satisfying, so only surface instabilities were analyzed in the design calculations. For this purpose, Geobrugg's RUVOLUM® program was used. Also, partial safety coefficients according to EUROCOD 7 were applied. Depending on the geo-specific conditions of each area, the calculations resulted in the need for TECCO G45/2 and TECCO G65/3 systems, respectively, in combination with solid bar anchor rods Ø 25 - 28 mm.

In compliance with the relevant legislation, it was necessary to carry out tensile tests on three separate anchors for each zone to confirm the anchors' ability to transfer the forces resulting from the design calculations to the ground. In the last position of the project, a 500 kJ GBE 500A rockfall protection barrier (L= 70 m, H = 2.0 m) was ordered.

Chroniony Objekt

Road

Ochrona przeciwerozyjna

GEOBRUGG SUPERCOATING, GEOBRUGG ULTRACOATING

Projektant

Inne zainstalowane aplikacje

Ochrona przed obrywami skalnymi

Osoba kontaktowa na miejscu

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Kopalnie / Wydobycie / Tunel
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Szwajcaria Country Manager Ost- und Zentralschweiz, Liechtenstein

Formularz kontaktowy

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Kopalnie / Wydobycie / Tunel
Geobrugg AG,Industriestrasse 21,5200 Brugg / Szwajcaria Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Formularz kontaktowy

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Zagrożeniami naturalnymi
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Szwajcaria Project Manager Inspection Services

Formularz kontaktowy

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Kopalnie / Wydobycie / Tunel
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Szwajcaria Ticino Country Manager

Formularz kontaktowy