Stabilisation des pentes - Mesteacan - National Road 1C 2011

Perfectly integrated slope stabilization with TECCO® SYSTEM³ (steepest part, directly next to the road)

Stabilisation des pentes - Mesteacan - National Road 1C 2011

The situation before the road was renovated - the demolition of the retaining wall and a change of the slope geometry change were necessary in order to widen the road

Stabilisation des pentes - Mesteacan - National Road 1C 2011

The slope after geometry changing earth works and thus prepared for the installation of the nails

Stabilisation des pentes - Mesteacan - National Road 1C 2011

Self drilling nails during top-down installation with the drill rig on the temporary berm

Stabilisation des pentes - Mesteacan - National Road 1C 2011

High tensile TECCO® G65/3 mesh and TECMAT® anti-erosion mat installation with a crane

Stabilisation des pentes - Mesteacan - National Road 1C 2011

TECCO® SYSETM³ before tensioning the system spike plates P33/40

Stabilisation des pentes - Mesteacan - National Road 1C 2011

Final installation overview - visible slope stabilization with TECCO® SYSTEM³ with its steepest part directly next to the road

 

Systèmes

 

Année d’installation

2011

Situation de départ

The national road DN1C connects the cities of Dej and Baia Mare. Total length of the road is 86,49 km and due to an increase in traffic, had to be rehabilitated. On several sectors the road was enlarged to 3 lanes.  In some areas slope stabilization measures were necessary due to topography and geology.

Géologie

Clay

Description

The designing office asked Geobrugg to provide an alternative solution to retaining walls, a solution which also could be revegetated. TECCO® SYSTEM³ was chosen and dimensioned to stabilize a total of 2600 m² of newly cut slopes.

Client

C.N.A.I.R. - Bucharest

Entrepreneur

FCC Construcţii Romania S.A.

Objet protégé

Route/Rue

Protection anticorrosion

GEOBRUGG SUPERCOATING

Ingénierie

IPTANA S.A. - Bucharest

Autres sociétés participantes

MAVO Transilvania S.R.L - Cluj Napoca

Votre contact local

Kevin H. Coyle
 

Kevin H. Coyle

Regional Manager Northeast

Risques naturels
Ingénierie Hydraulique
Geobrugg North America, LLC,3 Beaudet Terr,Columbia CT 06237 / Etats-Unis Regional Manager Northeast

E-mail

Saleh Feidi
 

Saleh Feidi

Regional Manager California

Risques naturels
Ingénierie Hydraulique
Geobrugg North America, LLC,8921 Emperor Ave.,San Gabriel, California 91775 / Etats-Unis Regional Manager California

E-mail

John Kalejta
 

John Kalejta

Regional Manager Central US

Risques naturels
Ingénierie Hydraulique
Geobrugg North America, LLC,3215 67th Avenue Pl,Greeley CO 80634 / Etats-Unis Regional Manager Central US

E-mail

Bob Lyne
 

Bob Lyne

Regional Manager Southeast

Risques naturels
Ingénierie Hydraulique
Geobrugg North America, LLC,8004 Windspray Drive,Summerfield NC 27358 / Etats-Unis Regional Manager Southeast

E-mail

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

Risques naturels
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer General Manager Geobrugg North America

E-mail

Tim Shevlin
 

Tim Shevlin

Sales Director

Risques naturels
Geobrugg North America, LLC,Salem OR 97302 / Etats-Unis Sales Director

E-mail