Schmerikon State Road 17

边坡稳定 - Schmerikon State Road 17 2013

Bird's eye view of the protected objects: State roadway, railway, bicycle path, building and port

边坡稳定 - Schmerikon State Road 17 2013

Slope failure seen shortly after the emergency work began a few days after the incident in June 2013

边坡稳定 - Schmerikon State Road 17 2013

Spider excavator during drilling

边坡稳定 - Schmerikon State Road 17 2013

Drilling along the top edge of the failed slope

边坡稳定 - Schmerikon State Road 17 2013

Drilling with manual equipment

边坡稳定 - Schmerikon State Road 17 2013

View of the upper section showing nailed TECCO G65/3, P33 spike plates and border rope

边坡稳定 - Schmerikon State Road 17 2013

Location: Zürichsee, Switzerland Federal Office of Topography, Bern, Switzerland National Map 1:50'000

 
 

安装年份

2013

情况

In the first days of June 2013 heavy storms and intense rainfall hit the region of the upper lake of Zurich. Due to saturation of the ground and instable geological conditions, a landslide buried a long section of heavily travelled commuter roadway and railway along the lake. This landslide caused complete closure of the infrastructure.

地質學

Top Section: weathered marl

Bottom section: weathered sandstone / siltstone

描述

The department for underground construction initiated re-establishment and sustainable prevention of future similar incidents a few days later. To reach a quick decision and accelerate the construction, the department quickly involved local and regional partners.

Solutions discussed were rockfall barrier, manifold, or anchored TECCO® System the most favorable and ultimately chosen solution.

The upper slope section (marl) was protected and stabilized using a nailed mesh. The lower sandstone/siltstone section was covered with a drape to ensure that falling debris is kept close to the slope while being guided and deposited to the ditch.

客户

State Department for Underground Engenieering, Canton St.Gallen

承包商

Oberholzer Bauleistungen Inc., Neuhaus, Switzerland

防护对象

Road, Railway, Infrastructure

腐蚀保护

GEOBRUGG SUPERCOATING

工程

Dr. A. Gübeli AG, Jona, Switzerland

本地联系方式

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Country Manager Ost- und Zentralschweiz, Liechtenstein

联系地址

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

联系地址

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Project Manager Inspection Services

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 瑞士 Ticino Country Manager

联系地址