La Entrada - Santa Rosa de Copán. Km152

边坡稳定 - La Entrada - Santa Rosa de Copán. Km152 2019

Road after the installation of the protective mesh with preinstalled erosion control mat

边坡稳定 - La Entrada - Santa Rosa de Copán. Km152 2019

Installation of the spike plates

边坡稳定 - La Entrada - Santa Rosa de Copán. Km152 2019

Slope stabilized with TECCO® GREEN G65/3

 

安装年份

2019

情况

Large blocks were likely to fall from the erosional layer at the bottom of the rockface.

地質學

Top layer: fractured rock
Bottom: soil

描述

To stabilize the blocks and to control the erosion on the lower layer TECCO® GREEN mesh with 6 m nails, a pattern of 2.3 x 2.3 m was installed.

客户

BCIE

承包商

Gabriel Couto

防护对象

Road

腐蚀保护

GEOBRUGG SUPERCOATING

工程

ACI

分包商

ICA Inversiones

本地联系方式

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Country Manager Ost- und Zentralschweiz, Liechtenstein

联系地址

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

联系地址

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Project Manager Inspection Services

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 瑞士 Ticino Country Manager

联系地址