瑞士
瑞士

myGeobrugg

Ablenkschutz Brückenpfeiler, Averstrasse

落石防护 - Ablenkschutz Brückenpfeiler, Averstrasse 2008

.

落石防护 - Ablenkschutz Brückenpfeiler, Averstrasse 2008

.

落石防护 - Ablenkschutz Brückenpfeiler, Averstrasse 2008

.

 

系统长度

18 m

 

安装年份

2008

情况

The old bridge over the Reno di Lei was hit by a rockfall. As part of the restoration work, a suitable measure was sought for protecting the old bridge – and the abutment of the new bridge situated above it – from falling rock. For reasons of aesthetics and to preserve the surrounding countryside, it was not possible to construct a rockfall protection roof above the portal.

描述

The solution presented by Geobrugg envisioned a RXI-200 rockfall barrier (2000 kJ) acting as a deflector, with the system being aligned almost vertically above the abutment. In contrast to a conventional rockfall barrier, three central suspension cables were installed in addition to the upper and lower suspension cables in order to reduce net deflection and allow rocks to be diverted.

客户

Graubünden Civil Engineering Authority

承包商

Crestageo AG, Chur

防护对象

Road, Other

工程

DIAG Davoser Ingenieure AG, Davos / Switzerland

本地联系方式

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Country Manager Ost- und Zentralschweiz, Liechtenstein

联系地址

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

联系地址

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Project Manager Inspection Services

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 瑞士 Ticino Country Manager

联系地址