 - Olt Valley, km 239+500 - 246+500 2015

GBE-1000A rockfall barrier protecting national road DN7

 - Olt Valley, km 239+500 - 246+500 2015

GBE-1000A rockfall barrier base plate anchors drilling works

 - Olt Valley, km 239+500 - 246+500 2015

Drilling flexible wire rope anchors for the GBE-1000A barrier

 - Olt Valley, km 239+500 - 246+500 2015

One of the GBE-1000A rockfall barrier lines, completely installed

 - Olt Valley, km 239+500 - 246+500 2015

GBE-1000A rockfall without border post - special solution for direct rock face connection

 - Olt Valley, km 239+500 - 246+500 2015

Perfect solution containing passive GBE-1000A rockfall barrier and active slope stabilization with nailed TECCO® SYSTEM³

 - Olt Valley, km 239+500 - 246+500 2015

Another line of GBE-1000A barrier with direct rock face connection

 - Olt Valley, km 239+500 - 246+500 2015

Fully installed VX-060L debris flow barrier

 - Olt Valley, km 239+500 - 246+500 2015

A short - only 22 m long - GBE-1000A barrier along national road DN7

 

システム

 

システム延長

20 m - 50 m

 

設置年

2015

状況

National road no. 7 (DN7) is one of the most important routes through the Carpathian Mountains, with heavy traffic. The Olt River runs parallel to the DN7 with high mountains, directly next to the road. In winter and spring rockfalls occur regularly. Also with unstable slopes, torrents and avalanches the risk of accidents was high. 

This project was originally developed with five concrete canopies for rockfall protection. Due to costs and other restrictions, a modern solution using high tensile steel wire was chosen. After further investigation, 23 dangerous areas were found and had to be protected using two types of protection systems: active and passive.

説明

GBE rockfall barriers were provided as a passive protection at the following sectors:

1. km 240+454 - 240+510

GBE-1000

  • capacity: 1000 kJ
  • height: 5 m
  • length: 56 m

2. km 240+555 - 240+577

GBE-1000

  • capacity: 1000 kJ
  • height: 3 m
  • length: 22 m

3. km 242+453 - 242+457 (as a debrisflow barrier)

VX-060

  • height: 3 m
  • length: 8 m

 4. km 242+457 - 242+610

GBE-1000

  • capacity: 1000 kJ
  • height: 4 m
  • length: 30 m and 36 m

 5. km 242+859 - 242+940

GBE-1000

  • capacity: 1000 kJ
  • height: 4 m
  • length: 30 m

 

6. km 243+099 - 243+179

GBE-1000

  • capacity: 1000 kJ
  • height: 4 m
  • length: 30 m

See also the other projects of Olt Valley.

顧客名

Compania Naţională de Administrare a Infrastructurii Rutiere (C.N.A.I.R.) – Directia Regionala de Drumuri si Poduri Craiova (D.R.D.P.)

落札者

S.C. VECTRA GROUP S.A.

保護対象

道路

腐食防止

亜鉛めっき, ジェオブルッグ スーパーコーティング

エンジニアリング

A.C. IRIMAT Cons S.R.L.

下請

Sachschische Bau GmbH Dresden Germany, Sibiu Branch

その他設置済み工法

斜面・法面対策工, 土石流・斜面崩壊対策工

担当者の連絡先

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Country Manager Ost- und Zentralschweiz, Liechtenstein

お問い合わせフォーム

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Industriestrasse 21,5200 Brugg / スイス Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

お問い合わせフォーム

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Project Manager Inspection Services

お問い合わせフォーム

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / スイス Ticino Country Manager

お問い合わせフォーム