スイス
スイス

myGeobrugg

 - Hospitalet-près-l'Andorre 2021

Two additional lines of one and two modules.

 - Hospitalet-près-l'Andorre 2021

The SPIDER® Dk 3.5 avalanche defense system is designed to withstand the snow heights expected locally

 - Hospitalet-près-l'Andorre 2021

The first line of 15.5 meters is composed of 4 modules in line

 - Hospitalet-près-l'Andorre 2021

Barrier line is located on a rugged slope.

 
 

システム延長

8 m - 15 m

 

設置年

2021

状況

The H24 chute which dominates the village of l'Hospitalet-près-l'Andorre is prone to avalanche departures as well as to rockfall which undermines avalanche control solutions.  

説明

We have provided a solution of tested avalanche barriers to catch falling rocks.
These systems are suitable for implementation in complex situations.

落札者

保護対象

居住区

腐食防止

ジェオブルッグ スーパーコーティング

エンジニアリング

RTM

担当者の連絡先

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Country Manager Ost- und Zentralschweiz, Liechtenstein

お問い合わせフォーム

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Industriestrasse 21,5200 Brugg / スイス Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

お問い合わせフォーム

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Project Manager Inspection Services

お問い合わせフォーム

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / スイス Ticino Country Manager

お問い合わせフォーム