スイス
スイス

myGeobrugg

 - Diana Falls 2014

.

 - Diana Falls 2014

.

 - Diana Falls 2014

.

 - Diana Falls 2014

.

 - Diana Falls 2014

.

 - Diana Falls 2014

.

 - Diana Falls 2014

.

 - Diana Falls 2014

.

 - Diana Falls 2014

.

 

システム延長

40 m - 60 m

 

設置年

2014

状況

Heavy rain cause a 40'000 cubic metre slip to completely close SH6 for several weeks in September 2013. Once cleared the road remained closed at night due to the continued high risk of rockfall from over 250 m up the slip face. Some of the unstable rocks were larger than 20 foot shipping containers.

説明

Geovert was awarded the contract to design and build a bespoke rockfall protection solution above the State Highway to actively control the frequent high energy rockfalls. The best solution for the site was the construction of a 5m high 3000 kJ and two 6 m high 5000 kJ Geobrugg attenuator barriers. The 3000 kJ system was installed over 250m above the highway, the first of the 5000 kJ system was installed 150 m up and the final and largest barrier was installed around 50 m above the road. The bottom rockfall attenuator was a massive structure with a 35 t high tensile steel ROCCO ring net drape to control and channel the falling rocks and debris to the roadside for the maintenance crew to clear.

Watch the clip of NZTransportAgency

顧客名

NZTA

落札者

Opus & Sicon Fergusson

保護対象

道路

エンジニアリング

Geovert

担当者の連絡先

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Country Manager Ost- und Zentralschweiz, Liechtenstein

お問い合わせフォーム

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Industriestrasse 21,5200 Brugg / スイス Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

お問い合わせフォーム

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Project Manager Inspection Services

お問い合わせフォーム

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / スイス Ticino Country Manager

お問い合わせフォーム