Suisse
Suisse

myGeobrugg

Stabilisation des pentes - Wetter L527 2014

Wetter before Installation

Stabilisation des pentes - Wetter L527 2014

Wetter after Installation

Stabilisation des pentes - Wetter L527 2014

Wetter after Installation

Stabilisation des pentes - Wetter L527 2014

Wetter after Installation

Stabilisation des pentes - Wetter L527 2014

Wetter after Installation

Stabilisation des pentes - Wetter L527 2014

Wetter after Installation

Stabilisation des pentes - Wetter L527 2014

Wetter before Installation

Stabilisation des pentes - Wetter L527 2014

Wetter before Installation

 

Systèmes

 

Année d’installation

2014

Situation de départ

The safety requirements for bike trails are higher than the ones for train tracks. To meet these requirements, the whole trial was examined and safety measurements requested for areas, where the slope was too steep.

Description

The route sections, which were steep enough to require saftey measurements, were at first cleaned on the surface and afterwards stabilized.

Client

Landesbetrieb Strassenbau NRW

Entrepreneur

Feldhaus Bergbau GmbH & Co. KG

Objet protégé

Route/Rue, Chemin de fer

Protection anticorrosion

GEOBRUGG SUPERCOATING

Ingénierie

Ahlenberg Ingenieure

Votre contact local

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suisse Country Manager Ost- und Zentralschweiz, Liechtenstein

E-mail

René Müller
   

René Müller

Country Manager Cantons AG BE BL BS FR GE JU NE SO VD VS

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suisse Country Manager Cantons AG BE BL BS FR GE JU NE SO VD VS

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Risques naturels
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suisse Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Suisse Ticino Country Manager

E-mail