Suisse
Suisse

myGeobrugg

S7 Express Road Lubien bypass slope stabilization

Stabilisation des pentes - S7 Express Road Lubien bypass slope stabilization 2009

Rockface stabilized with SPIDER® net

Stabilisation des pentes - S7 Express Road Lubien bypass slope stabilization 2009

Holding back rock blocks

Stabilisation des pentes - S7 Express Road Lubien bypass slope stabilization 2009

Not only road protection: also protecting this statue of a saint

Stabilisation des pentes - S7 Express Road Lubien bypass slope stabilization 2009

Protected road

 

Année d’installation

2009

Situation de départ

-

Description

High water flows.

Client

National Road dept. Warsaw / GDDKiA Warszawa

Entrepreneur

IMB Podbeskidzie Sp. z o.o.

Objet protégé

Route/Rue

Protection anticorrosion

GEOBRUGG SUPERCOATING

Ingénierie

Andrzej Kulawik Engineering Office

Votre contact local

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suisse Country Manager Ost- und Zentralschweiz, Liechtenstein

E-mail

René Müller
   

René Müller

Country Manager Cantons AG BE BL BS FR GE JU NE SO VD VS

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suisse Country Manager Cantons AG BE BL BS FR GE JU NE SO VD VS

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Risques naturels
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suisse Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Suisse Ticino Country Manager

E-mail