瑞士
瑞士

myGeobrugg

Trachtbach, Canton of Bern

泥石流和滑坡防护 - Trachtbach, Canton of Bern 2009

UX160-H4 equipped with abrasion control elements

泥石流和滑坡防护 - Trachtbach, Canton of Bern 2009

UX-160-H4 combined with a bed reinforced with rock blocks.

泥石流和滑坡防护 - Trachtbach, Canton of Bern 2009

VX140-H4 was designed to perfectly fit within the stream.

泥石流和滑坡防护 - Trachtbach, Canton of Bern 2009

VX140-H4 was designed to perfectly fit within the stream.

泥石流和滑坡防护 - Trachtbach, Canton of Bern 2009

A light step excavator was used for drilling the anchors and the subsequent assembly of the ring net.

 

系统长度

15 m - 37 m

 

安装年份

2009

情况

The historic village of Brienz is built on an alluvial fan at the foot of a large catchment area. In 2005, after a period of extraordinarily heavy precipitation, the Trachtbach carried enormous amounts of debris and buried several buildings, a road and a tourist railway. To prevent similar impacts in future, the torrent was tamed with a combination of different protection measures including the GEOBRUGG debris flow barriers.

描述

The three VX ring net barriers in the Trachtbach have an almost identical flume geometry. All three barriers can retain a volume of 4,000 m³ for a total retention capacity of 12,000 m³.

The VX ring net barriers are dimensioned with a a clearly defined overflow section so there is no risk of the debris flow material breaking laterally. The abrasion plate protects the top of the barrier from potential damage by debris that may be present in subsequent flows and overflows. For drilling the anchors and the subsequent assembly of the ROCCO ring nets, a light step excavator was utilized. No heavy machinery was required for assembling the anchorages.

VX140-H4 dimensions:
Barrier 1: bottom width 5.5 m / top width 15 m
Barrier 2: bottom width 6.5 m / top width  17 m
Barrier 3: bottom width 7.0 m / top width  20 m

The single UX160-H4 barrier has a retention volume of 6,000 m³. The bottom width of the barrier is 16 m and the top width is 37 m.

In the event of complete barrier activation, the four barriers together provide an unfilled retention capacity of 18,000 m³.

客户

Political Community of Brienz

防护对象

Road, Building

工程

Kellerhals + Haefeli, Berne

本地联系方式

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Country Manager Ost- und Zentralschweiz, Liechtenstein

联系地址

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

联系地址

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Project Manager Inspection Services

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 瑞士 Ticino Country Manager

联系地址