瑞士
瑞士

myGeobrugg

落石防护 - PH Belen 2015

Installed GBE-1000A-R rockfall barrier.

落石防护 - PH Belen 2015

Installed GBE-100A rockfall barrier.

落石防护 - PH Belen 2015

Installed GBE-500A-R rockfall barrier.

落石防护 - PH Belen 2015

Installed GBE-100A rockfall barrier.

落石防护 - PH Belen 2015

Installed SL-150 shallow landslide barrier.

落石防护 - PH Belen 2015

Slope protection with TECCO® SYSTEM3 and DELTAX® mesh.

 

系统长度

7 m - 24 m

 

安装年份

2015

情况

Two pipes and the hydro power house station of PH Belén were threatened by rockfalls.

描述

Combined solution was implemented, including GBE rockfall barriers, shallow landslide barrier and active slope stabilization with TECCO® SYSTEM³ and DELTAX® mesh.

客户

CNFL

承包商

Consorcio Durman - Rodio

防护对象

Road, Building

腐蚀保护

GEOBRUGG SUPERCOATING, GEOBRUGG ULTRACOATING

工程

CNFL

其他安装的应用程序

边坡稳定

本地联系方式

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Country Manager Ost- und Zentralschweiz, Liechtenstein

联系地址

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

联系地址

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Project Manager Inspection Services

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 瑞士 Ticino Country Manager

联系地址