瑞士
瑞士

myGeobrugg

Fierza Hydroelectric Power Station #1

落石防护 - Fierza Hydroelectric Power Station #1 2014

Barrier RXI-100 installed on the slope.

落石防护 - Fierza Hydroelectric Power Station #1 2014

Barrier TXI-010 with installed fixed posts (visible lack of space for retaining ropes).

落石防护 - Fierza Hydroelectric Power Station #1 2014

Fully installed TXI-010 barrier directly next to the road.

落石防护 - Fierza Hydroelectric Power Station #1 2014

Some installation required helicopter usage.

 

系统长度

15 m - 80 m

 

安装年份

2014

情况

Rockfalls endangered the roads around Fierza hydroelectric power station.

描述

Rockfall protection with TXI-010 barriers (system with no retaining ropes) and RXI-100 barriers.

As seen in the photos, parts of the project were installed by helicopter, clearly demonstrating how lightweight Geobrugg's systems are.

客户

KESH Albania

承包商

Cresta Geo Switzerland

防护对象

Road, Building

本地联系方式

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Country Manager Ost- und Zentralschweiz, Liechtenstein

联系地址

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

联系地址

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Project Manager Inspection Services

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 瑞士 Ticino Country Manager

联系地址