瑞士
瑞士

myGeobrugg

边坡稳定 - Châteaubourg 2022

1,400 m² of mesh protect the castle - the measure is hardly visible

边坡稳定 - Châteaubourg 2022

The netting perfectly adapts to the underground

 

系统

 

安装年份

2022

情况

Erosion problem at the foot of the 9th century castle

描述

To overcome the erosion problem, 1400 m² of DELTAX netting was installed at the foot of the Châteaubourg castle - a perfect example of integration into the landscape.

客户

Mairie de Châteaubourg

承包商

防护对象

Building

腐蚀保护

GEOBRUGG ULTRACOATING

工程

本地联系方式

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Country Manager Ost- und Zentralschweiz, Liechtenstein

联系地址

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

联系地址

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Project Manager Inspection Services

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 瑞士 Ticino Country Manager

联系地址