Ochrona przed obrywami skalnymi - Malshej Ghat, NH 222 (3) 2021

The 10000 kJ Rockfall barrier protecting the National Highway

Ochrona przed obrywami skalnymi - Malshej Ghat, NH 222 (3) 2021

Installation of the rockfall barrier with a crane

 

Zastosowane systemy

 

Dlugosc systemu od

50 m

 

Rok Instalacji / Montazu

2021

Sytuacja początkowa

Malshej Ghat lies in the northern part of the Western Ghats of Deccan Trap, within the Maharashtra Volcanic Provenance characterized by highly dissected terrain with flat summits, mural slopes, serrated ridges, and entrenched valleys. Slope masses are made of basalt rock and its weathered crust (debris/soil). 

The rockfall problem occurs in rainy seasons due to induced pore water pressure and reduced strength of the rock masses. About 12 km of the National Highway 222 (Kalyan-Ahmednagar) passes the Malshej Ghat and experiences frequent rockfalls, slope failure due to complex geological conditions, heavy rainfall, and slope geometry.

Opis zastosowanego rozwiazania

About 70 meters above the highway road level, an RXE rockfall barrier was installed. The impact absorption energy is 10'000 kJ. Worldwide this barrier is the second with such an impact absorption capacity.

This video shows the dimensions of the strongest rockfall barrier in the world.

Inwestor

National Highway Division, Thane , Public Works Department

Chroniony Objekt

Road

Osoba kontaktowa na miejscu

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Kopalnie / Wydobycie / Tunel
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Szwajcaria Country Manager Ost- und Zentralschweiz, Liechtenstein

Formularz kontaktowy

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Kopalnie / Wydobycie / Tunel
Geobrugg AG,Industriestrasse 21,5200 Brugg / Szwajcaria Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Formularz kontaktowy

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Zagrożeniami naturalnymi
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Szwajcaria Project Manager Inspection Services

Formularz kontaktowy

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Kopalnie / Wydobycie / Tunel
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Szwajcaria Ticino Country Manager

Formularz kontaktowy