myGeobrugg
2015
After a rockslide event which blocked the traffic, a slope stabilization became necessary
Active slope stabilization was implemented using TECCO® System anchored with 8 m threadbare nails in a pattern of 2.0 m by 2.0 m.
Globalvia Ruta 27
Rodio Swissboring
道路
ジェオブルッグ スーパーコーティング
INSUMA S.A.