Suisse
Suisse

myGeobrugg

Stabilisation des pentes - West Virginia Abandoned Mine 2006

TECCO® stabilized masonry block wall

Stabilisation des pentes - West Virginia Abandoned Mine 2006

Failed masonary-block wall prior to reconstruction

Stabilisation des pentes - West Virginia Abandoned Mine 2006

Mine refuse slope prior to stabilization

Stabilisation des pentes - West Virginia Abandoned Mine 2006

Drilling anchors

Stabilisation des pentes - West Virginia Abandoned Mine 2006

TECCO® Slope Stabilization

 

Systèmes

 

Année d’installation

2006

Situation de départ

Prior to the 1977 Surface Mining Act, coal refuse was dumped along the sides of hill slopes or into hollows without compaction or attention to drainage control or erosion. Over time, these slopes can significantly displace and fail. At an abandoned mine lands site in West Virginia, there was an unstable slope consisting of mine refuse and also a masonry stone block wall that was failing.

Subsoil:
Basalt
Residual soil/coluvium

Géologie

mine refuse

Description

Today, anchored TECCO G65-3mm mesh stabilizes the unstable mine refuse slope and the stone wall. The anchors were installed through the failing wall into the stable surface.

Client

WV Department of Environmental Protection

Entrepreneur

Green Mountain Construction

Objet protégé

Route/Rue, Carrière / Mines

Protection anticorrosion

GEOBRUGG SUPERCOATING

Ingénierie

Ackenheil Engineering

Autres applications installées

Exploitation minière / Tunnel

Votre contact local

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suisse Country Manager Ost- und Zentralschweiz, Liechtenstein

E-mail

René Müller
   

René Müller

Country Manager Cantons AG BE BL BS FR GE JU NE SO VD VS

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suisse Country Manager Cantons AG BE BL BS FR GE JU NE SO VD VS

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Risques naturels
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suisse Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Suisse Ticino Country Manager

E-mail